Z--Folsom Right Wing Dam Ditch Bypass Modifications

Posted Date: Feb 11, 2025
Due Date: Mar 06, 2025
Awarded Date: No Awarded Date
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
140R2025R0004 Z--Folsom Right Wing Dam Ditch Bypass Modifications
Synopsis
This requirement involves removing existing conduit; removing concrete headwall, adding a seepage stability berm, and installing toe drain inspection wells. .... Read More
Office Location Agency Name Solicitation Base Posting Type
BUREAU OF RECLAMATION Combined Synopsis/Solicitation
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
140R2025R0004 Z--Folsom Right Wing Dam Ditch Bypass Modifications
Synopsis
This requirement involves removing existing conduit; removing concrete headwall, adding a seepage stability berm, and installing toe drain inspection wells. .... Read More
Office Location Agency Name Solicitation Base Posting Type
BUREAU OF RECLAMATION Combined Synopsis/Solicitation
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
140R2025R0004 Folsom Right Wing Dam Ditch Bypass Modifications
Synopsis
Folsom Right Wing Dam Ditch Bypass Modifications .... Read More
Office Location Agency Name Solicitation Base Posting Type
BUREAU OF RECLAMATION Combined Synopsis/Solicitation
SetAside Type
Solicitation ID Solicitation Title Solicitation Office
140R2025R0004 Z--Folsom Right Wing Dam - North Fork Ditch Bypass
Synopsis
The purpose of this amendment is to correct the name of the attachment of the solicitation to 140R2025R0004. .... Read More
Office Location Agency Name Solicitation Base Posting Type
BUREAU OF RECLAMATION Presolicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙