SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
140R2025R0004 | Z--Folsom Right Wing Dam Ditch Bypass Modifications | |
Synopsis | ||
This requirement involves removing existing conduit; removing concrete headwall, adding a seepage stability berm, and installing toe drain inspection wells. .... Read More
|
||
Office Location | Agency Name | Solicitation Base Posting Type |
BUREAU OF RECLAMATION | Combined Synopsis/Solicitation |
SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
140R2025R0004 | Z--Folsom Right Wing Dam Ditch Bypass Modifications | |
Synopsis | ||
This requirement involves removing existing conduit; removing concrete headwall, adding a seepage stability berm, and installing toe drain inspection wells. .... Read More
|
||
Office Location | Agency Name | Solicitation Base Posting Type |
BUREAU OF RECLAMATION | Combined Synopsis/Solicitation |
SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
140R2025R0004 | Folsom Right Wing Dam Ditch Bypass Modifications | |
Synopsis | ||
Folsom Right Wing Dam Ditch Bypass Modifications .... Read More
|
||
Office Location | Agency Name | Solicitation Base Posting Type |
BUREAU OF RECLAMATION | Combined Synopsis/Solicitation |
SetAside Type | ||
Solicitation ID | Solicitation Title | Solicitation Office |
140R2025R0004 | Z--Folsom Right Wing Dam - North Fork Ditch Bypass | |
Synopsis | ||
The purpose of this amendment is to correct the name of the attachment of the solicitation to 140R2025R0004. .... Read More
|
||
Office Location | Agency Name | Solicitation Base Posting Type |
BUREAU OF RECLAMATION | Presolicitation |