SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
140G0125Q0052 | Z--CERC A3 Single Phase Electrical Panel Upgrade | |
Synopsis | ||
*Amendment 004* - Q&A
*Amendment 003 - Additional site visit* *Amendment 002 - Q&A and update SOW* *Amendment 001 - Q&A* The U.S. Geological Survey Columbia Environmental Research Center (CERC) has a requirement for an electrical upgrade to include but not limited to removing and replacing the existing building main single-phase 1200-amp disconnect with a new 600-volt 1200-amp distribution panel at the Columbia Environmental Research Center (CERC) in Columbia, MO. The contractor shall provide all labor, material, tools, equipment, and supervision necessary. The magnitude of construction is between $100,000 and $250,000. Request for Quote (RFQ) 140G0125Q0052 will be issued on or about 2/6/2025 with written quotes .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
US GEOLOGICAL SURVEY | Combined Synopsis/Solicitation |
SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
140G0125Q0052 | Z--CERC A3 Single Phase Electrical Panel Upgrade | |
Synopsis | ||
*Amendment 002 - Q&A and update SOW*
*Amendment 001 - Q&A* The U.S. Geological Survey Columbia Environmental Research Center (CERC) has a requirement for an electrical upgrade to include but not limited to removing and replacing the existing building main single-phase 1200-amp disconnect with a new 600-volt 1200-amp distribution panel at the Columbia Environmental Research Center (CERC) in Columbia, MO. The contractor shall provide all labor, material, tools, equipment, and supervision necessary. The magnitude of construction is between $100,000 and $250,000. Request for Quote (RFQ) 140G0125Q0052 will be issued on or about 2/6/2025 with written quotes due on 2/28/2025. Upon award payment protections are .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
US GEOLOGICAL SURVEY | Combined Synopsis/Solicitation |
SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
140G0125Q0052 | CERC A3 Single Phase Electrical Panel Upgrade | |
Synopsis | ||
The U.S. Geological Survey Columbia Environmental Research Center (CERC) has a requirement for an electrical upgrade to include but not limited to removing and replacing the existing building main single-phase 1200-amp disconnect with a new 600-volt 1200-amp distribution panel at the Columbia Environmental Research Center (CERC) in Columbia, MO. The contractor shall provide all labor, material, tools, equipment, and supervision necessary.
The magnitude of construction is between $100,000 and $250,000. Request for Quote (RFQ) 140G0125Q0052 will be issued on or about 2/6/2025 with written quotes due on 2/28/2025. Upon award payment protections are required. There will be a site visit. All contractors are .... Read More |
||