SetAside Type | ||
Solicitation ID | Solicitation Title | Solicitation Office |
140R3024R0033 | Z--150-ton cableway crane at the Hoover Dam that need | |
Synopsis | ||
Z--150-ton cableway crane at the Hoover Dam that need .... Read More
|
||
Office Location | Agency Name | Solicitation Base Posting Type |
BUREAU OF RECLAMATION | Combined Synopsis/Solicitation |
SetAside Type | ||
Solicitation ID | Solicitation Title | Solicitation Office |
140R3024R0033 | Z--150-ton cableway crane at the Hoover Dam that need | |
Synopsis | ||
Z--150-ton cableway crane at the Hoover Dam that need .... Read More
|
||
Office Location | Agency Name | Solicitation Base Posting Type |
BUREAU OF RECLAMATION | Combined Synopsis/Solicitation |
SetAside Type | ||
Solicitation ID | Solicitation Title | Solicitation Office |
140R3024R0033 | 150-ton cableway crane at the Hoover Dam that need | |
Synopsis | ||
150-ton cableway crane at the Hoover Dam that need .... Read More
|
||
Office Location | Agency Name | Solicitation Base Posting Type |
BUREAU OF RECLAMATION | Combined Synopsis/Solicitation |
SetAside Type | ||
Solicitation ID | Solicitation Title | Solicitation Office |
140R3024R0033 | Z--150-ton Cableway Crane Refurbishment Hoover Dam | |
Synopsis | ||
The Bureau of Reclamation, Interior Region 8: Lower Colorado Basin (LCB) is issuing a Request for Proposal (RFP) for a firm fixed-price contract for the 150-ton cableway crane at the Hoover Dam that needs to be refurbished.
The Bureau of Reclamation, Interior Region 8: Lower Colorado Basin has a requirement for the 150-ton cableway crane at the Hoover Dam that needs to be refurbished. The ground to the middle of the track cables is approximately 600 feet. When work is being completed on the NV tower, the ground is approximately 100 feet below. The track cables spans from the AZ .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
BUREAU OF RECLAMATION | Presolicitation |