Y1DA--EHRM Infrastructure Upgrades Data Center Construction - St. Louis JB - Project 657-21-709JB

Posted Date: Feb 11, 2025
Due Date: May 21, 2025
Awarded Date: No Awarded Date
SetAside Type
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-A
Solicitation ID Solicitation Title Solicitation Office
36C77625B0008 Y1DA--EHRM Infrastructure Upgrades Data Center Construction - St. Louis JB - Project 657-21-709JB
Synopsis
Page 1 of 1 INTRODUCTION: The Department of Veterans Affairs (VA), Veterans Health Administration (VHA), Program Contracting Activity Central (PCAC) anticipates soliciting bids and subsequently awarding a single Firm-Fixed-Price contract for the Design-Bid-Build EHRM Infrastructure Upgrades Data Center Construction project at the St. Louis VA Medical Center (VAMC) located at 1 Jefferson Barracks Dr., St. Louis, MO 63125. PROJECT DESCRIPTION: The St. Louis (Jefferson Barracks) VAMC is seeking a general contractor to furnish all labor, tools, materials, equipment, and supervision to construct a new EHRM Data Center in the Basement of Bldg. 56. The current data center in Bldg. 1 .... Read More
Office Location Agency Name Solicitation Base Posting Type
VETERANS AFFAIRS, DEPARTMENT OF Presolicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙