Y--BLM-WY IRA NEW FORK RIVER, SHEEP FENCE

Posted Date: Jan 14, 2025
Due Date: Jan 28, 2025
Awarded Date: Jan 13, 2025
SetAside Type
Solicitation ID Solicitation Title Solicitation Office
140L6225Q0005 Y--BLM-WY IRA NEW FORK RIVER, SHEEP FENCE
Synopsis
IRA NEW FORK RIVER, SHEEP FENCE - convert approximately 3.52 miles existing barbed wire fence to a wildlife friendly fence.

Awarded to Low Price Technically Acceptable Responsive Offer .... Read More
Office Location Agency Name Solicitation Base Posting Type
BUREAU OF LAND MANAGEMENT AWARD Notice
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
140L6225Q0005 Y--IRA NEW FORK RIVER, SHEEP FENCE
Synopsis
IRA NEW FORK RIVER, SHEEP FENCE

The work includes converting an existing barbed wire fence to a wildlife friendly fence. This fence consists of two segments: New Fork River Fence, and Sheep Fence on New Fork.
The total length of the two segments combined is approximately 3.52 miles.
It is the Contractor's responsibility to ensure that livestock does not cross through the opening between when the old fence is removed, and the new fence is constructed.
Period of Performance for this fence is 08/15/25-11/15/25.

Specifics for Segment No. 1 - New Fork River Fence:
Location: T31N, R109W, Sections 21, 28, and .... Read More
Office Location Agency Name Solicitation Base Posting Type
BUREAU OF LAND MANAGEMENT Combined Synopsis/Solicitation
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
140L6225Q0005 Y--IRA NEW FORK RIVER, SHEEP FENCE
Synopsis
IRA NEW FORK RIVER, SHEEP FENCE

The work includes converting an existing barbed wire fence to a wildlife friendly fence. This fence consists of two segments: New Fork River Fence, and Sheep Fence on New Fork.
The total length of the two segments combined is approximately 3.52 miles.
It is the Contractor's responsibility to ensure that livestock does not cross through the opening between when the old fence is removed, and the new fence is constructed.
Period of Performance for this fence is 08/15/25-11/15/25.

Specifics for Segment No. 1 - New Fork River Fence:
Location: T31N, R109W, Sections 21, 28, and .... Read More
Office Location Agency Name Solicitation Base Posting Type
BUREAU OF LAND MANAGEMENT Combined Synopsis/Solicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙