SetAside Type | ||
Solicitation ID | Solicitation Title | Solicitation Office |
140L6225Q0005 | Y--BLM-WY IRA NEW FORK RIVER, SHEEP FENCE | |
Synopsis | ||
IRA NEW FORK RIVER, SHEEP FENCE - convert approximately 3.52 miles existing barbed wire fence to a wildlife friendly fence.
Awarded to Low Price Technically Acceptable Responsive Offer .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
BUREAU OF LAND MANAGEMENT | AWARD Notice |
SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
140L6225Q0005 | Y--IRA NEW FORK RIVER, SHEEP FENCE | |
Synopsis | ||
IRA NEW FORK RIVER, SHEEP FENCE
The work includes converting an existing barbed wire fence to a wildlife friendly fence. This fence consists of two segments: New Fork River Fence, and Sheep Fence on New Fork. The total length of the two segments combined is approximately 3.52 miles. It is the Contractor's responsibility to ensure that livestock does not cross through the opening between when the old fence is removed, and the new fence is constructed. Period of Performance for this fence is 08/15/25-11/15/25. Specifics for Segment No. 1 - New Fork River Fence: Location: T31N, R109W, Sections 21, 28, and .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
BUREAU OF LAND MANAGEMENT | Combined Synopsis/Solicitation |
SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
140L6225Q0005 | Y--IRA NEW FORK RIVER, SHEEP FENCE | |
Synopsis | ||
IRA NEW FORK RIVER, SHEEP FENCE
The work includes converting an existing barbed wire fence to a wildlife friendly fence. This fence consists of two segments: New Fork River Fence, and Sheep Fence on New Fork. The total length of the two segments combined is approximately 3.52 miles. It is the Contractor's responsibility to ensure that livestock does not cross through the opening between when the old fence is removed, and the new fence is constructed. Period of Performance for this fence is 08/15/25-11/15/25. Specifics for Segment No. 1 - New Fork River Fence: Location: T31N, R109W, Sections 21, 28, and .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
BUREAU OF LAND MANAGEMENT | Combined Synopsis/Solicitation |