Y--BLM-WY IRA NEW FORK BLUE RIM INDIVIDUAL FENCE

Posted Date: Jan 14, 2025
Due Date: Jan 29, 2025
Awarded Date: Jan 14, 2025
SetAside Type
Solicitation ID Solicitation Title Solicitation Office
140L6225Q0004 Y--BLM-WY IRA NEW FORK BLUE RIM INDIVIDUAL FENCE
Synopsis
IRA NEW FORK BLUE RIM INDIVIDUAL FENCE-convert approximately 3.3 miles existing barbed wire fence to a wildlife friendly fence.

Awarded to Low Price Technically Acceptable Responsive Offer
.... Read More
Office Location Agency Name Solicitation Base Posting Type
BUREAU OF LAND MANAGEMENT AWARD Notice
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
140L6225Q0004 Y--IRA NEW FORK BLUE RIM INDIVIDUAL FENCE
Synopsis
IRA NEW FORK BLUE RIM INDIVIDUAL FENCE

The work includes converting an existing barbed wire fence to a wildlife friendly fence. The total length of fence is approximately 3.3 miles. It is the Contractor's responsibility to ensure that livestock does not cross through the opening between when the old fence is removed, and the new fence is constructed. The period of performance for the construction work is 08/15/2025-11/15/2025.

Specifics for the New Fork Blue Rim Individual Fence:
Location: T31N, R109W, Sections 22, 23, and 24
There are approximately 17,424 linear feet in this segment of fence to be removed and .... Read More
Office Location Agency Name Solicitation Base Posting Type
BUREAU OF LAND MANAGEMENT Combined Synopsis/Solicitation
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
140L6225Q0004 Y--IRA NEW FORK BLUE RIM INDIVIDUAL FENCE
Synopsis
IRA NEW FORK BLUE RIM INDIVIDUAL FENCE

The work includes converting an existing barbed wire fence to a wildlife friendly fence. The total length of fence is approximately 3.3 miles. It is the Contractor's responsibility to ensure that livestock does not cross through the opening between when the old fence is removed, and the new fence is constructed. The period of performance for the construction work is 08/15/2025-11/15/2025.

Specifics for the New Fork Blue Rim Individual Fence:
Location: T31N, R109W, Sections 22, 23, and 24
There are approximately 17,424 linear feet in this segment of fence to be removed and .... Read More
Office Location Agency Name Solicitation Base Posting Type
BUREAU OF LAND MANAGEMENT Combined Synopsis/Solicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙