USCGC MIDGETT BALLAST TANK MAINTENANCE

Posted Date: Feb 21, 2025
Due Date: Mar 08, 2025
Awarded Date: No Awarded Date
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
70Z085Q1328 USCGC MIDGETT BALLAST TANK MAINTENANCE
Synopsis

General Requirements

  1. SCOPE

    1. Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.? 

  1. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 418A-WMSL-801-001, Rev A, Booklet of General Plans

Coast Guard Drawing 750-WMSL-085-024, Rev A, Tank Sounding and Moment of Inertia Tables (ASC085014H) (WMSL 757 Only)

Coast Guard Drawing 750-WMSL-100-013, Rev L, Unit 1210 Structure .... Read More

Office Location Agency Name Solicitation Base Posting Type
US COAST GUARD Combined Synopsis/Solicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙