SetAside Type | ||
Solicitation ID | Solicitation Title | Solicitation Office |
NAVMWR-25-Q-0018 | SUBASE Kings Bay Car Wash Equipment Replacement | |
Synopsis | ||
The Contractor shall provide all services, including materials, labor and installation required for the complete removal and replacement of a four (4) bay self-service car wash system located at SUBASE Kings Bay. Work shall include but is not limited to the following: 1. Site Investigation: The Contractor shall provide and perform all necessary site investigation and utility locates (including, but not limited to, sub-surface utility “pot holing”) as required to complete the project. All site investigation activities shall be coordinated with appropriate Installation personnel through the Point of Contact (POC). 2. Materials: The Contractor shall provide all materials, equipment and .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE NAVY | Combined Synopsis/Solicitation |
SetAside Type | ||
Solicitation ID | Solicitation Title | Solicitation Office |
NAVMWR-25-Q-0018 | SUBASE Kings Bay Car Wash Equipment Replacement | |
Synopsis | ||
The Contractor shall provide all services, including materials, labor and installation required for the complete removal and replacement of a four (4) bay self-service car wash system located at SUBASE Kings Bay. Work shall include but is not limited to the following: 1. Site Investigation: The Contractor shall provide and perform all necessary site investigation and utility locates (including, but not limited to, sub-surface utility “pot holing”) as required to complete the project. All site investigation activities shall be coordinated with appropriate Installation personnel through the Point of Contact (POC). 2. Materials: The Contractor shall provide all materials, equipment and .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE NAVY | Combined Synopsis/Solicitation |