Space Launch System (SLS), Interim Cryogenic Propulsion Stage (ICPS) Period of Performance Extension

Posted Date: Nov 13, 2024
Due Date: Dec 14, 2024
Awarded Date: No Awarded Date
SetAside Type
Solicitation ID Solicitation Title Solicitation Office
NNM12AA82C Space Launch System (SLS), Interim Cryogenic Propulsion Stage (ICPS) Period of Performance Extension
Synopsis

INTRODUCTION

The NASA Marshall Space Flight Center (NASA/MSFC) has a requirement to extend the period of performance (PoP) for the Space Launch System (SLS) Spacecraft / Payload Integration and Evolution (SPIE) Interim Cryogenic Propulsion Stage (ICPS) contract number NNM12AA82C with The Boeing Company (i.e., Boeing). The services to be provided include, but are not limited to: development or assessment, sustaining engineering (maintenance), field engineering changes, management, and disposal, as well as any ancillary activities associated with prior production efforts for previously procured ICPS flight hardware, including but not limited to, the operation and maintenance, verification and validation, certification, transportation .... Read More

Office Location Agency Name Solicitation Base Posting Type
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION Presolicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙