SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
70Z085Q250011354 | SLEDGE UNDERWATER HULL REPAIR | |
Synopsis | ||
THIS WILL BE AWARDED UNDER LOWEST PRICE TECHNICALLY ACCEPTABLE AND PAST PREFORMANCE. STATEMENT OF WORK (SOW) FOR USCGC SLEDGE (WLIC-75) UNDERWATER HULL REPAIR CGC SLEDGE has water intrusion through the hull below the forward potable water tank and requires repair for the tasks outlined in this SOW. 1.0 GENERAL 1.1 BACKGROUND During routine rounds, approximately one inch of water was observed in the bilge beneath the forward potable water tank. After pumping out the accumulated water, it was noted that water was seeping back through .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
US COAST GUARD | Combined Synopsis/Solicitation |