SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
Roof_replacement_at_MFE_ATCT | Roof replacement at MFE ATCT (McAllen, TX) | |
Synopsis | ||
Modification 01 - Site Visit date/time ALCON - the site visit will take place at 0900 on 12/17/24 Modification 02 - Second site visit to account for mold abatement ALCON - the site visit will take place at 0900 on on 02/05/25 All work shall be performed IAW the specifications and drawings and shall be completed in strict accordance with the manufacturer’s guidelines. Performance includes, but is not limited to, the following: Civil/Architectural: Replace PVC roof membrane system on Cab Roof Replace PVC roof membrane system on Tower Catwalk Replace .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
FEDERAL AVIATION ADMINISTRATION | Combined Synopsis/Solicitation |
SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
Roof_replacement_at_MFE_ATCT | Roof replacement at MFE ATCT (McAllen, TX) | |
Synopsis | ||
Modification 01 - Site Visit date/time ALCON - the site visit will take place at 0900 on 12/17/24 All work shall be performed IAW the specifications and drawings and shall be completed in strict accordance with the manufacturer’s guidelines. Performance includes, but is not limited to, the following: Civil/Architectural: Replace PVC roof membrane system on Cab Roof Replace PVC roof membrane system on Tower Catwalk Replace the vinyl Sidings of the ATCT including above and below the Cab windows Construct stud structural framing and Exterior Insulation Finishing System (EIFS) on the .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
FEDERAL AVIATION ADMINISTRATION | Combined Synopsis/Solicitation |
SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
Roof_replacement_at_MFE_ATCT | Roof replacement at MFE ATCT (McAllen, TX) | |
Synopsis | ||
All work shall be performed IAW the specifications and drawings and shall be completed in strict accordance with the manufacturer’s guidelines. Performance includes, but is not limited to, the following: Civil/Architectural: Replace PVC roof membrane system on Cab Roof Replace PVC roof membrane system on Tower Catwalk Replace the vinyl Sidings of the ATCT including above and below the Cab windows Construct stud structural framing and Exterior Insulation Finishing System (EIFS) on the ATCT Construct perimeter foundation beam for EIFS Replace the front exterior door (Storefront) Reconstruct concrete side walk at storefront .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
FEDERAL AVIATION ADMINISTRATION | Combined Synopsis/Solicitation |