Synopsis

The Contractor shall supply all supervision, labor, material, and equipment as required to replace Air Handling Unit #3, located on the roof at Oceana-3030. In general, the Scope of Work includes secure all electrical power to the Air Handling Unit (AHU #3) utilizing OSHA approved Lockout/ Tag out procedures. Disconnect and remove all wiring to the AHU, to include control wiring, temperature sensors, water valve actuators, damper actuators, low ambient temperature cutout, and any conduit or junction boxes and gauges mounted on the AHU or its piping. Materials shall be selectively disconnected, protected from damage and may be reused for .... Read More

Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE NAVY Combined Synopsis/Solicitation
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
N4008523R2780 REPLACE AHU#3 ABOVE ROOM 39, BLDG 3030, NAS OCEANA
Synopsis

The Contractor shall supply all supervision, labor, material, and equipment as required to replace Air Handling Unit #3, located on the roof at Oceana-3030. In general, the Scope of Work includes secure all electrical power to the Air Handling Unit (AHU #3) utilizing OSHA approved Lockout/ Tag out procedures. Disconnect and remove all wiring to the AHU, to include control wiring, temperature sensors, water valve actuators, damper actuators, low ambient temperature cutout, and any conduit or junction boxes and gauges mounted on the AHU or its piping. Materials shall be selectively disconnected, protected from damage and may be reused for .... Read More

Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE NAVY Combined Synopsis/Solicitation
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
N4008523R2780 REPLACE AHU#3 ABOVE ROOM 39, BLDG 3030, NAS OCEANA
Synopsis

The Contractor shall supply all supervision, labor, material, and equipment as required to replace Air Handling Unit #3, located on the roof at Oceana-3030. In general, the Scope of Work includes secure all electrical power to the Air Handling Unit (AHU #3) utilizing OSHA approved Lockout/ Tag out procedures. Disconnect and remove all wiring to the AHU, to include control wiring, temperature sensors, water valve actuators, damper actuators, low ambient temperature cutout, and any conduit or junction boxes and gauges mounted on the AHU or its piping. Materials shall be selectively disconnected, protected from damage and may be reused for .... Read More

Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE NAVY Combined Synopsis/Solicitation
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
N4008523R2780 REPLACE AHU#3 ABOVE ROOM 39, BLDG 3030, NAS OCEANA
Synopsis

The Contractor shall supply all supervision, labor, material, and equipment as required to replace Air Handling Unit #3, located on the roof at Oceana-3030. In general, the Scope of Work includes secure all electrical power to the Air Handling Unit (AHU #3) utilizing OSHA approved Lockout/ Tag out procedures. Disconnect and remove all wiring to the AHU, to include control wiring, temperature sensors, water valve actuators, damper actuators, low ambient temperature cutout, and any conduit or junction boxes and gauges mounted on the AHU or its piping. Materials shall be selectively disconnected, protected from damage and may be reused for .... Read More

Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE NAVY Combined Synopsis/Solicitation
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
N4008523R2780 REPLACE AHU#3 ABOVE ROOM 39, BLDG 3030, NAS OCEANA
Synopsis

The Contractor shall supply all supervision, labor, material, and equipment as required to replace Air Handling Unit #3, located on the roof at Oceana-3030. In general, the Scope of Work includes secure all electrical power to the Air Handling Unit (AHU #3) utilizing OSHA approved Lockout/ Tag out procedures. Disconnect and remove all wiring to the AHU, to include control wiring, temperature sensors, water valve actuators, damper actuators, low ambient temperature cutout, and any conduit or junction boxes and gauges mounted on the AHU or its piping. Materials shall be selectively disconnected, protected from damage and may be reused for .... Read More

Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE NAVY Combined Synopsis/Solicitation
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
N4008523R2780 REPLACE AHU#3 ABOVE ROOM 39, BLDG 3030, NAS OCEANA
Synopsis

The Contractor shall supply all supervision, labor, material, and equipment as required to replace Air Handling Unit #3, located on the roof at Oceana-3030. In general, the Scope of Work includes secure all electrical power to the Air Handling Unit (AHU #3) utilizing OSHA approved Lockout/ Tag out procedures. Disconnect and remove all wiring to the AHU, to include control wiring, temperature sensors, water valve actuators, damper actuators, low ambient temperature cutout, and any conduit or junction boxes and gauges mounted on the AHU or its piping. Materials shall be selectively disconnected, protected from damage and may be reused for .... Read More

Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE NAVY Combined Synopsis/Solicitation
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
N4008523R2780 REPLACE AHU#3 ABOVE ROOM 39, BLDG 3030, NAS OCEANA
Synopsis

The Contractor shall supply all supervision, labor, material, and equipment as required to replace Air Handling Unit #3, located on the roof at Oceana-3030. In general, the Scope of Work includes secure all electrical power to the Air Handling Unit (AHU #3) utilizing OSHA approved Lockout/ Tag out procedures. Disconnect and remove all wiring to the AHU, to include control wiring, temperature sensors, water valve actuators, damper actuators, low ambient temperature cutout, and any conduit or junction boxes and gauges mounted on the AHU or its piping. Materials shall be selectively disconnected, protected from damage and may be reused for .... Read More

Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE NAVY Combined Synopsis/Solicitation
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
N4008523R2780 REPLACE AHU#3 ABOVE ROOM 39, BLDG 3030, NAS OCEANA
Synopsis

The Contractor shall supply all supervision, labor, material, and equipment as required to replace Air Handling Unit #3, located on the roof at Oceana-3030. In general, the Scope of Work includes secure all electrical power to the Air Handling Unit (AHU #3) utilizing OSHA approved Lockout/ Tag out procedures. Disconnect and remove all wiring to the AHU, to include control wiring, temperature sensors, water valve actuators, damper actuators, low ambient temperature cutout, and any conduit or junction boxes and gauges mounted on the AHU or its piping. Materials shall be selectively disconnected, protected from damage and may be reused for .... Read More

Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE NAVY Combined Synopsis/Solicitation
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
N4008523R2780 REPLACE AHU#3 ABOVE ROOM 39, BLDG 3030, NAS OCEANA
Synopsis

The Contractor shall supply all supervision, labor, material, and equipment as required to replace Air Handling Unit #3, located on the roof at Oceana-3030. In general, the Scope of Work includes secure all electrical power to the Air Handling Unit (AHU #3) utilizing OSHA approved Lockout/ Tag out procedures. Disconnect and remove all wiring to the AHU, to include control wiring, temperature sensors, water valve actuators, damper actuators, low ambient temperature cutout, and any conduit or junction boxes and gauges mounted on the AHU or its piping. Materials shall be selectively disconnected, protected from damage and may be reused for .... Read More

Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE NAVY Combined Synopsis/Solicitation
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
N4008523R2780 REPLACE AHU#3 ABOVE ROOM 39, BLDG 3030, NAS OCEANA
Synopsis
REPLACE AHU#3 ABOVE ROOM 39, BLDG 3030, NAS OCEANA .... Read More
Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE NAVY Combined Synopsis/Solicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙