SetAside Type | ||
Solicitation ID | Solicitation Title | Solicitation Office |
W912EP25C0002 | PALM BEACH HARBOR MAINTENANCE DREDGING, ENTRANCE CHANNEL AND SETTLING BASIN, PALM BEACH COUNTY, FLORIDA | |
Synopsis | ||
Project work consists of maintenance dredging Palm Beach Harbor within the Entrance Channel, Settling Basin, Extended Settling Basin, and the southern portion of the Expanded Settling Basin. All material is to be placed in the Beach Placement Area located immediately south of the inlet from November 1 through April 30. Incidental work includes, but is not limited to turbidity monitoring, screening, tilling, vibration control and monitoring, and environmental species monitoring. Project work consists of a base and three options. Coast Guard Certified dredging equipment is required. .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE ARMY | AWARD Notice |
SetAside Type | ||
Solicitation ID | Solicitation Title | Solicitation Office |
W912EP25C0002 | PALM BEACH HARBOR MAINTENANCE DREDGING, ENTRANCE CHANNEL AND SETTLING BASIN, PALM BEACH COUNTY, FLORIDA | |
Synopsis | ||
Project work consists of maintenance dredging Palm Beach Harbor within the Entrance Channel, Settling Basin, Extended Settling Basin, and the southern portion of the Expanded Settling Basin. All material is to be placed in the Beach Placement Area located immediately south of the inlet from November 1 through April 30. Incidental work includes, but is not limited to turbidity monitoring, screening, tilling, vibration control and monitoring, and environmental species monitoring. Project work consists of a base and three options. Coast Guard Certified dredging equipment is required. .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE ARMY | AWARD Notice |