SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
12048925Q0008 | One Duck Trail Reconstruction and Shelter Repairs | |
Synopsis | ||
This work is for the reconstruction of approximately 2300 linear feet of the One Duck Trail, (5) rest areas and repairs to the existing alpine shelter. Major work items include but are not limited to; aggregate surfacing, boardwalk, stonework, drainage improvements, and demolition & removal of old trail structures. Option Item’s major work includes but is not limited to; (5) rest areas with benches, armored swales near shelter, improving existing foundation around shelter, and replacing several bunk and floor boards. Base Bid described below: BASE BID: Starting at station 0+00 beside existing Alpine Shelter and ending .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
FOREST SERVICE | Combined Synopsis/Solicitation |
SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
12048925Q0008 | One Duck Trail Reconstruction and Shelter Repairs | |
Synopsis | ||
This work is for the reconstruction of approximately 2300 linear feet of the One Duck Trail, (5) rest areas and repairs to the existing alpine shelter. Major work items include but are not limited to; aggregate surfacing, boardwalk, stonework, drainage improvements, and demolition & removal of old trail structures. Option Item’s major work includes but is not limited to; (5) rest areas with benches, armored swales near shelter, improving existing foundation around shelter, and replacing several bunk and floor boards. Base Bid described below: BASE BID: Starting at station 0+00 beside existing Alpine Shelter and ending .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
FOREST SERVICE | Combined Synopsis/Solicitation |