SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
6982AF25B000001 | NM ERFO FS SNTFE 2022-1(1) El Porvenir Bridge | |
Synopsis | ||
PROJECT NUMBER: NM ERFO FS SNTFE 2022-1(1) PROJECT NAME: EL PORVENIR BRIDGE PROJECT DESCRIPTION: The purpose of this project is to replace the previous bridge which was destroyed in the Hermits Peak/ Calf Canyon fire in April 2022. The bridge is located in the Santa Fe National Forest, approximately 17-miles northwest of Las Vegas, NM. The project is considered 4R and located in Mountainous terrain. SCOPE OF THE WORK: The proposed improvements include a new bridge west of the previously destroyed structure. The replacement bridge is planned to be a prefabricated steel structure with a span .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
FEDERAL HIGHWAY ADMINISTRATION | Combined Synopsis/Solicitation |
SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
6982AF25B000001 | NM ERFO FS SNTFE 2022-1(1) El Porvenir Bridge | |
Synopsis | ||
PROJECT NUMBER: NM ERFO FS SNTFE 2022-1(1) PROJECT NAME: EL PORVENIR BRIDGE PROJECT DESCRIPTION: The purpose of this project is to replace the previous bridge which was destroyed in the Hermits Peak/ Calf Canyon fire in April 2022. The bridge is located in the Santa Fe National Forest, approximately 17-miles northwest of Las Vegas, NM. The project is considered 4R and located in Mountainous terrain. SCOPE OF THE WORK: The proposed improvements include a new bridge west of the previously destroyed structure. The replacement bridge is planned to be a prefabricated steel structure with a span .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
FEDERAL HIGHWAY ADMINISTRATION | Combined Synopsis/Solicitation |
SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
6982AF25B000001 | NM ERFO FS SNTFE 2022-1(1) El Porvenir Bridge | |
Synopsis | ||
PROJECT NUMBER: NM ERFO FS SNTFE 2022-1(1) PROJECT NAME: EL PORVENIR BRIDGE PROJECT DESCRIPTION: The purpose of this project is to replace the previous bridge which was destroyed in the Hermits Peak/ Calf Canyon fire in April 2022. The bridge is located in the Santa Fe National Forest, approximately 17-miles northwest of Las Vegas, NM. The project is considered 4R and located in Mountainous terrain. SCOPE OF THE WORK: The proposed improvements include a new bridge west of the previously destroyed structure. The replacement bridge is planned to be a prefabricated steel structure with a span .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
FEDERAL HIGHWAY ADMINISTRATION | Combined Synopsis/Solicitation |
SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
6982AF25B000001 | NM ERFO FS SNTFE 2022-1(1) El Porvenir Bridge | |
Synopsis | ||
PROJECT NUMBER: NM ERFO FS SNTFE 2022-1(1) PROJECT NAME: EL PORVENIR BRIDGE PROJECT DESCRIPTION: The purpose of this project is to replace the previous bridge which was destroyed in the Hermits Peak/ Calf Canyon fire in April 2022. The bridge is located in the Santa Fe National Forest, approximately 17-miles northwest of Las Vegas, NM. The project is considered 4R and located in Mountainous terrain. SCOPE OF THE WORK: The proposed improvements include a new bridge west of the previously destroyed structure. The replacement bridge is planned to be a prefabricated steel structure with a span .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
FEDERAL HIGHWAY ADMINISTRATION | Combined Synopsis/Solicitation |
SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
6982AF25B000001 | NM ERFO FS SNTFE 2022-1(1) El Porvenir Bridge | |
Synopsis | ||
PROJECT NUMBER: NM ERFO FS SNTFE 2022-1(1) PROJECT NAME: EL PORVENIR BRIDGE PROJECT DESCRIPTION: The purpose of this project is to replace the previous bridge which was destroyed in the Hermits Peak/ Calf Canyon fire in April 2022. The bridge is located in the Santa Fe National Forest, approximately 17-miles northwest of Las Vegas, NM. The project is considered 4R and located in Mountainous terrain. SCOPE OF THE WORK: The proposed improvements include a new bridge west of the previously destroyed structure. The replacement bridge is planned to be a prefabricated steel structure with a span .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
FEDERAL HIGHWAY ADMINISTRATION | Combined Synopsis/Solicitation |
SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
6982AF25B000001 | NM ERFO FS SNTFE 2022-1(1) El Porvenir Bridge | |
Synopsis | ||
PROJECT NUMBER: NM ERFO FS SNTFE 2022-1(1) PROJECT NAME: EL PORVENIR BRIDGE PROJECT DESCRIPTION: The purpose of this project is to replace the previous bridge which was destroyed in the Hermits Peak/ Calf Canyon fire in April 2022. The bridge is located in the Santa Fe National Forest, approximately 17-miles northwest of Las Vegas, NM. The project is considered 4R and located in Mountainous terrain. SCOPE OF THE WORK: The proposed improvements include a new bridge west of the previously destroyed structure. The replacement bridge is planned to be a prefabricated steel structure with a span .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
FEDERAL HIGHWAY ADMINISTRATION | Combined Synopsis/Solicitation |
SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
6982AF25B000001 | NM ERFO FS SNTFE 2022-1(1) El Porvenir Bridge | |
Synopsis | ||
NM ERFO FS SNTFE 2022-1(1) El Porvenir Bridge .... Read More
|
||
Office Location | Agency Name | Solicitation Base Posting Type |
FEDERAL HIGHWAY ADMINISTRATION | Presolicitation |