SetAside Type | ||
Solicitation ID | Solicitation Title | Solicitation Office |
69056724B000016 | MT FLAP BOR 2980(1), Sun River Bridge Replacement | |
Synopsis | ||
Update 10/18/2024: QA_10-18-2024.pdf posted to attachments. Update 10/18/2024: Due to technical error, some physical data files did not upload when the solicitation was initially posted. The remaining physical data files are available under Physical Data_2.zip. PROJECT: MT FLAP BOR 2980(1), Sun River Bridge Replacement LOCATION: 50 miles NW of Augusta, MT WORK: The work consists of building a new bridge about 200 feet downstream of the existing bridge, with new approach. The approaches are on embankments and MSE wall approaches. Final surfacing will be gravel for approaches and concrete on the bridge. The project includes construction .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
FEDERAL HIGHWAY ADMINISTRATION | Combined Synopsis/Solicitation |
SetAside Type | ||
Solicitation ID | Solicitation Title | Solicitation Office |
69056724B000016 | MT FLAP BOR 2980(1), Sun River Bridge Replacement | |
Synopsis | ||
Update 10/18/2024: QA_10-18-2024.pdf posted to attachments. Update 10/18/2024: Due to technical error, some physical data files did not upload when the solicitation was initially posted. The remaining physical data files are available under Physical Data_2.zip. PROJECT: MT FLAP BOR 2980(1), Sun River Bridge Replacement LOCATION: 50 miles NW of Augusta, MT WORK: The work consists of building a new bridge about 200 feet downstream of the existing bridge, with new approach. The approaches are on embankments and MSE wall approaches. Final surfacing will be gravel for approaches and concrete on the bridge. The project includes construction .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
FEDERAL HIGHWAY ADMINISTRATION | Combined Synopsis/Solicitation |
SetAside Type | ||
Solicitation ID | Solicitation Title | Solicitation Office |
69056724B000016 | MT FLAP BOR 2980(1), Sun River Bridge Replacement | |
Synopsis | ||
Update 10/18/2024: QA_10-18-2024.pdf posted to attachments. Update 10/18/2024: Due to technical error, some physical data files did not upload when the solicitation was initially posted. The remaining physical data files are available under Physical Data_2.zip. PROJECT: MT FLAP BOR 2980(1), Sun River Bridge Replacement LOCATION: 50 miles NW of Augusta, MT WORK: The work consists of building a new bridge about 200 feet downstream of the existing bridge, with new approach. The approaches are on embankments and MSE wall approaches. Final surfacing will be gravel for approaches and concrete on the bridge. The project includes construction .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
FEDERAL HIGHWAY ADMINISTRATION | Combined Synopsis/Solicitation |
SetAside Type | ||
Solicitation ID | Solicitation Title | Solicitation Office |
69056724B000016 | MT FLAP BOR 2980(1), Sun River Bridge Replacement | |
Synopsis | ||
Update 10/18/2024: QA_10-18-2024.pdf posted to attachments. Update 10/18/2024: Due to technical error, some physical data files did not upload when the solicitation was initially posted. The remaining physical data files are available under Physical Data_2.zip. PROJECT: MT FLAP BOR 2980(1), Sun River Bridge Replacement LOCATION: 50 miles NW of Augusta, MT WORK: The work consists of building a new bridge about 200 feet downstream of the existing bridge, with new approach. The approaches are on embankments and MSE wall approaches. Final surfacing will be gravel for approaches and concrete on the bridge. The project includes construction .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
FEDERAL HIGHWAY ADMINISTRATION | Combined Synopsis/Solicitation |
SetAside Type | ||
Solicitation ID | Solicitation Title | Solicitation Office |
69056724B000016 | MT FLAP BOR 2980(1), Sun River Bridge Replacement | |
Synopsis | ||
Update 10/18/2024: QA_10-18-2024.pdf posted to attachments. Update 10/18/2024: Due to technical error, some physical data files did not upload when the solicitation was initially posted. The remaining physical data files are available under Physical Data_2.zip. PROJECT: MT FLAP BOR 2980(1), Sun River Bridge Replacement LOCATION: 50 miles NW of Augusta, MT WORK: The work consists of building a new bridge about 200 feet downstream of the existing bridge, with new approach. The approaches are on embankments and MSE wall approaches. Final surfacing will be gravel for approaches and concrete on the bridge. The project includes construction .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
FEDERAL HIGHWAY ADMINISTRATION | Combined Synopsis/Solicitation |
SetAside Type | ||
Solicitation ID | Solicitation Title | Solicitation Office |
69056724B000016 | MT FLAP BOR 2980(1), Sun River Bridge Replacement | |
Synopsis | ||
Update 10/18/2024: QA_10-18-2024.pdf posted to attachments. Update 10/18/2024: Due to technical error, some physical data files did not upload when the solicitation was initially posted. The remaining physical data files are available under Physical Data_2.zip. PROJECT: MT FLAP BOR 2980(1), Sun River Bridge Replacement LOCATION: 50 miles NW of Augusta, MT WORK: The work consists of building a new bridge about 200 feet downstream of the existing bridge, with new approach. The approaches are on embankments and MSE wall approaches. Final surfacing will be gravel for approaches and concrete on the bridge. The project includes construction .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
FEDERAL HIGHWAY ADMINISTRATION | Combined Synopsis/Solicitation |
SetAside Type | ||
Solicitation ID | Solicitation Title | Solicitation Office |
69056724B000016 | MT FLAP BOR 2980(1), Sun River Bridge Replacement | |
Synopsis | ||
Update 10/18/2024: QA_10-18-2024.pdf posted to attachments. Update 10/18/2024: Due to technical error, some physical data files did not upload when the solicitation was initially posted. The remaining physical data files are available under Physical Data_2.zip. PROJECT: MT FLAP BOR 2980(1), Sun River Bridge Replacement LOCATION: 50 miles NW of Augusta, MT WORK: The work consists of building a new bridge about 200 feet downstream of the existing bridge, with new approach. The approaches are on embankments and MSE wall approaches. Final surfacing will be gravel for approaches and concrete on the bridge. The project includes construction .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
FEDERAL HIGHWAY ADMINISTRATION | Combined Synopsis/Solicitation |
SetAside Type | ||
Solicitation ID | Solicitation Title | Solicitation Office |
69056724B000016 | MT FLAP BOR 2980(1), Sun River Bridge Replacement | |
Synopsis | ||
Update 10/18/2024: QA_10-18-2024.pdf posted to attachments. Update 10/18/2024: Due to technical error, some physical data files did not upload when the solicitation was initially posted. The remaining physical data files are available under Physical Data_2.zip. PROJECT: MT FLAP BOR 2980(1), Sun River Bridge Replacement LOCATION: 50 miles NW of Augusta, MT WORK: The work consists of building a new bridge about 200 feet downstream of the existing bridge, with new approach. The approaches are on embankments and MSE wall approaches. Final surfacing will be gravel for approaches and concrete on the bridge. The project includes construction .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
FEDERAL HIGHWAY ADMINISTRATION | Combined Synopsis/Solicitation |
SetAside Type | ||
Solicitation ID | Solicitation Title | Solicitation Office |
69056724B000016 | MT FLAP BOR 2980(1), Sun River Bridge Replacement | |
Synopsis | ||
Update 10/18/2024: QA_10-18-2024.pdf posted to attachments. Update 10/18/2024: Due to technical error, some physical data files did not upload when the solicitation was initially posted. The remaining physical data files are available under Physical Data_2.zip. PROJECT: MT FLAP BOR 2980(1), Sun River Bridge Replacement LOCATION: 50 miles NW of Augusta, MT WORK: The work consists of building a new bridge about 200 feet downstream of the existing bridge, with new approach. The approaches are on embankments and MSE wall approaches. Final surfacing will be gravel for approaches and concrete on the bridge. The project includes construction .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
FEDERAL HIGHWAY ADMINISTRATION | Combined Synopsis/Solicitation |
SetAside Type | ||
Solicitation ID | Solicitation Title | Solicitation Office |
69056724B000016 | MT FLAP BOR 2980(1), Sun River Bridge Replacement | |
Synopsis | ||
Update 10/18/2024: QA_10-18-2024.pdf posted to attachments. Update 10/18/2024: Due to technical error, some physical data files did not upload when the solicitation was initially posted. The remaining physical data files are available under Physical Data_2.zip. PROJECT: MT FLAP BOR 2980(1), Sun River Bridge Replacement LOCATION: 50 miles NW of Augusta, MT WORK: The work consists of building a new bridge about 200 feet downstream of the existing bridge, with new approach. The approaches are on embankments and MSE wall approaches. Final surfacing will be gravel for approaches and concrete on the bridge. The project includes construction .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
FEDERAL HIGHWAY ADMINISTRATION | Combined Synopsis/Solicitation |
SetAside Type | ||
Solicitation ID | Solicitation Title | Solicitation Office |
69056724B000016 | MT FLAP BOR 2980(1), Sun River Bridge Replacement | |
Synopsis | ||
PROJECT: MT FLAP BOR 2980(1), Sun River Bridge Replacement LOCATION: 50 miles NW of Augusta, MT WORK: The work consists of building a new bridge about 200 feet downstream of the existing bridge, with new approach. The approaches are on embankments and MSE wall approaches. Final surfacing will be gravel for approaches and concrete on the bridge. The project includes construction of a 3 span, 462-foot long precast-post-tensioned girder bridge with a precast concrete deck. Abutments are founded on both spread footing and piles within an MSE wall fill. Piers are supported on 10 foot diameter drilled .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
FEDERAL HIGHWAY ADMINISTRATION | Combined Synopsis/Solicitation |
SetAside Type | ||
Solicitation ID | Solicitation Title | Solicitation Office |
69056724B000016 | MT FLAP BOR 2980(1), Sun River Bridge Replacement | |
Synopsis | ||
PROJECT: MT FLAP BOR 2980(1), Sun River Bridge Replacement LOCATION: 50 miles NW of Augusta, MT WORK: The work consists of building a new bridge about 200 feet downstream of the existing bridge, with new approach. The approaches are on embankments and MSE wall approaches. Final surfacing will be gravel for approaches and concrete on the bridge. The project includes construction of a 3 span, 462-foot long precast-post-tensioned girder bridge with a precast concrete deck. Abutments are founded on both spread footing and piles within an MSE wall fill. Piers are supported on 10 foot diameter drilled .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
FEDERAL HIGHWAY ADMINISTRATION | Combined Synopsis/Solicitation |
SetAside Type | ||
Solicitation ID | Solicitation Title | Solicitation Office |
69056724B000016 | MT FLAP BOR 2980(1), Sun River Bridge Replacement | |
Synopsis | ||
MT FLAP BOR 2980(1), Sun River Bridge Replacement .... Read More
|
||
Office Location | Agency Name | Solicitation Base Posting Type |
FEDERAL HIGHWAY ADMINISTRATION | Presolicitation |