LD2&3 Concrete Testing

Posted Date: Nov 25, 2024
Due Date: Dec 17, 2024
Awarded Date: No Awarded Date
SetAside Type
Solicitation ID Solicitation Title Solicitation Office
W912ES25Q0017 LD2&3 Concrete Testing
Synopsis

The purpose of this Amendment is to include verbiage in the scope of work and in Clause 52.212-2, Evaluations. The following informatio has been included in the scope of work and within the Evaluation clause.

" All lab testing must be accomplished via a certified U.S. Army Engineer Research and Development Center.  The most current list of registries can be located at  https://mtc.erdc.dren.mil/map.aspx."

Clause 52.212-2, Evaluations has been updated to include technical evalaution.

The response date remains the same.

 The contractor will investigate and evaluate the interior concrete condition of the upper guide walls at LDs .... Read More

Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE ARMY Combined Synopsis/Solicitation
SetAside Type
Solicitation ID Solicitation Title Solicitation Office
W912ES25Q0017 LD2&3 Concrete Testing
Synopsis

The contractor will investigate and evaluate the interior concrete condition of the upper guide walls at LDs 2 & 3. The contractor will vertically drill and extract eight (8) – 4 inch diameter cores at each site, to a depth indicated within the Scope of Work, from LD 2 & 3. Contractor shall complete lab testing that includes inspection and documentation of each sample, full petrographic analysis of two cores at each site, and compressive strength testing of 10 cores. The results shall be compiled into a report, submitted to the District Concrete Materials Engineer within 90 days of contract award.

.... Read More
Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE ARMY Combined Synopsis/Solicitation