SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
127EAX25R0001 | Granite Reef Improvements - Tonto National Forest | |
Synopsis | ||
All work shall be completed in accordance with the project specifications and drawings. The work includes all labor, materials, and equipment necessary to perform all operations for the work specified. The Contractor shall be responsible for the layout survey, construction control, and establishing and maintaining all horizontal and vertical control required. The project will require moving the existing vault toilet to a location within the project site as identified on the drawings. Moving the vault toilet will include moving the housing, vault tank, and demolition of adjacent concrete around the existing vault toilet as marked by the Contracting .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
FOREST SERVICE | Combined Synopsis/Solicitation |