Design/Build Construction for San Juan Hurricane Rebuild Rio Bayamon at USCG Base San Juan, San Juan, PR (Phase 1-Reprocurement)

Posted Date: Jan 22, 2025
Due Date: Feb 10, 2025
Awarded Date: Jan 15, 2025
SetAside Type
Solicitation ID Solicitation Title Solicitation Office
70Z04724RPCNI0007 Design/Build Construction for San Juan Hurricane Rebuild Rio Bayamon at USCG Base San Juan, San Juan, PR (Phase 1-Reprocurement)
Synopsis

This Requirement will consist of Infrastructure, Utilities Distribution and Resiliency for Rio
Bayamon Housing Sites.

.... Read More
Office Location Agency Name Solicitation Base Posting Type
US COAST GUARD AWARD Notice
SetAside Type
Solicitation ID Solicitation Title Solicitation Office
70Z04724RPCNI0007 Design/Build Construction for San Juan Hurricane Rebuild Rio Bayamon at USCG Base San Juan, San Juan, PR (Phase 1-Reprocurement)
Synopsis
Design/Build Construction for San Juan Hurricane Rebuild Rio Bayamon at USCG Base San Juan, San Juan, PR (Phase 1-Reprocurement) .... Read More
Office Location Agency Name Solicitation Base Posting Type
US COAST GUARD Combined Synopsis/Solicitation
SetAside Type
Solicitation ID Solicitation Title Solicitation Office
70Z04724RPCNI0007 Design/Build Construction for San Juan Hurricane Rebuild Rio Bayamon at USCG Base San Juan, San Juan, PR (Phase 1-Reprocurement)
Synopsis
Design/Build Construction for San Juan Hurricane Rebuild Rio Bayamon at USCG Base San Juan, San Juan, PR (Phase 1-Reprocurement) .... Read More
Office Location Agency Name Solicitation Base Posting Type
US COAST GUARD Combined Synopsis/Solicitation
SetAside Type
Solicitation ID Solicitation Title Solicitation Office
70Z04724RPCNI0007 Design/Build Construction for San Juan Hurricane Rebuild Rio Bayamon at USCG Base San Juan, San Juan, PR (Phase 1-Reprocurement)
Synopsis

THIS DESIGN BUILD PROJECT IS POSTED EXCLUSIVELY FOR THOSE CONTRACTORS ON THE CURRENT DHS/USCG NATIONAL MULTIPLE AWARD CONSTRUCTION CONTRACT III (NMACC III – Pool 1).

This project is for design-build with the intention to rebuild to resilient standards shore facilities at U.S. Coast Guard Sector San Juan required as a result of damages sustained during Hurricane Maria. Phase 1 will consist of Infrastructure, Utilities Distribution and Resiliency for Rio Bayamon Housing Sites. Work shall include new campus wide generator system and distribution. A new water storage tank with pump and for distribution is included.

.... Read More
Office Location Agency Name Solicitation Base Posting Type
US COAST GUARD Combined Synopsis/Solicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙