BIL WEI BURCHFIELD BRANCH WATER LINE REPLACEMENT

Posted Date: Nov 04, 2024
Due Date: Nov 16, 2024
Awarded Date: Nov 01, 2024
SetAside Type
8(a) Sole Source (FAR 19.8)
Solicitation ID Solicitation Title Solicitation Office
W9127825C0002 BIL WEI BURCHFIELD BRANCH WATER LINE REPLACEMENT
Synopsis

The primary purpose of this project is to replace the existing water line at Burchfield Branch Park, Adger, Alabama. Burchfield Branch Park is supplied water by Warrior River Water Authority in Jefferson County and is metered at the Tuscaloosa- Jefferson County line along Bankhead Road. An existing 3-inch water line along Bankhead (Lock 17) Road supplies both the park and Bankhead Lock and Dam domestic water. Multiple Pressure Reducing Valves (PRVs) are located along the water line to reduce system pressure increases
associated with the park’s elevation changes.

.... Read More
Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE ARMY AWARD Notice
An error has occurred. This application may no longer respond until reloaded. Reload 🗙