Bayou Caddy Ecosystem Restoration (Shoreline Stabilization) project

Posted Date: Jan 15, 2025
Due Date: Jan 29, 2025
Awarded Date: Jan 14, 2025
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
W9127825P0012 Bayou Caddy Ecosystem Restoration (Shoreline Stabilization) project
Synopsis

This award is a Firm Fixed Price (FFP) award with a One(1) year period of performance for Bayou Caddy Ecosystem Restoration with USACE Irvington Site Office.

Bayou Caddy Ecosystem Restoration:

This project entails an herbicide treatment of phragmites, an invasive plant identified during recent post-construction monitoring events, within four areas of the 22-acre restored marsh (Figure 2). The goal is to remove phragmites without causing damage to restored marsh plantings. This is intended to be a one-time spray treatment, after which additional follow-up or annual control treatments may be required, depending upon the results. Contractor shall provide all equipment, materials, transportation, and personnel required to accomplish the tasks described herein.

.... Read More
Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE ARMY AWARD Notice
An error has occurred. This application may no longer respond until reloaded. Reload 🗙